Healthcare Construction Services for Hospitals, Clinics, and Medical Offices
Epic Construction Management is a healthcare construction contractor out of Schaumburg. We work with hospitals, medical practices, and facility owners throughout the greater Chicago area. Our healthcare construction services cover everything from a hospital wing to a single exam suite, and on each one we plan the budget, the schedule, and infection control side by side. In a medical building, you can’t change one without moving the other two.
Let's Discuss Your Project
Fill out the form and we’ll contact you soon.
40+ years managing complex projects.
Projects stay on track and on schedule.
Consistent quality throughout every phase.
Proactive planning protects budget timeline.
- Our Services
Healthcare Construction Services We Provide
Put a contractor who mostly builds offices inside a working hospital, and the gaps show up fast. Healthcare work answers to state reviewers, infection preventionists, and fire marshals all at once. As a healthcare general contractor, Epic Construction Management builds hospitals, medical offices, and clinics with that in mind, from preconstruction right through closeout.
Hospital Construction Service
Our hospital construction team handles new buildings, additions, and renovations in acute care, surgical, and diagnostic units. As a hospital contractor, we phase around patient care first. Containment stays up, utilities stay on, and the next-door department keeps running.
Medical Office Construction
Our medical office building construction runs from ground-up builds to shell fit-outs and build-outs for physician groups. As medical building contractors, we pin down exam rooms, imaging, and specialty systems early, since those push an opening date back.
Medical Clinic Construction
Our medical clinic construction covers urgent care, outpatient, surgical, and specialty suites, dental and imaging rooms included. Opening day matters, and we get that. Some trades overlap to save time, but inspections can’t be squeezed, and we won’t try.
Need a Healthcare Construction Partner?
If you have drawings for a new wing or clinic, even rough ones, send them over, and we will tell you plainly what it will take to build.
Hospital Construction
Our hospital construction team handles new buildings, additions, and renovations in acute care, surgical, and diagnostic units. As a hospital contractor, we phase around patient care first. Containment stays up, utilities stay on, and the next-door department keeps running.
Medical Office Construction
Our medical office building construction runs from ground-up builds to shell fit-outs and build-outs for physician groups. As medical building contractors, we pin down exam rooms, imaging, and specialty systems early, since those push an opening date back.
Medical Clinic Construction
Our medical clinic construction covers urgent care, outpatient, surgical, and specialty suites, dental and imaging rooms included. Opening day matters, and we get that. Some trades overlap to save time, but inspections can’t be squeezed, and we won’t try.
- Industries We Serve
Industries We Serve Through Construction Services
Epic Construction Management provides commercial construction and management services across Chicago’s Northwest Suburbs. We work with businesses, property owners, and organizations across multiple industries, coordinating construction, renovations, expansions, and improvements to meet project requirements, schedules, and budgets.
Hotel construction and renovation services include property improvements, interior build-outs, and facility upgrades, with project coordination focused on schedules, budgets, and construction requirements.
Plant expansion projects involve construction activities, site improvements, and facility upgrades, coordinated with project schedules and operational requirements to support industrial growth.
Dental Clinics
Dental clinic construction and renovations include treatment room layouts, interior improvements, and building systems, coordinated with project schedules and the operational needs of dental practices.
Supermarket construction and renovation services include retail layouts, facility improvements, and construction activities, coordinated with project schedules and the operational requirements of grocery businesses.
Auto dealership construction and renovations include showroom improvements, service department upgrades, and facility layouts, coordinated with project schedules and dealership operational requirements.
Healthcare construction and renovations include medical offices, clinics, and facility improvements, coordinated with project planning, construction schedules, budgets, and healthcare facility requirements.
- work process
Healthcare Construction Process from Concept to Completion
Each project runs on a documented process. Our healthcare design and construction approach starts where yours does, with patients. We would rather argue about phasing on paper than discover a problem with a crew already on site.

Initial Consultation
First, we sit down with your facilities and clinical leads. Goals and budget matter, of course. We'll also ask about shift changes and patient flow, since they tell us which departments can close, and for how long.
Planning and Preconstruction
Then come the estimates, schedule, and phasing plan. Your infection preventionist joins us for the ICRA here, and together we agree on barrier locations, the path workers take, and the order of work.
Construction Execution
Once we're building, our team manages the trades and walks the site for infection control each day. Loud work happens at night. Negative air keeps the dust on our side of the wall, not with patients.
Quality Assurance and Closeout
To close out, we handle inspections and licensure paperwork and then walk the space with you. It's yours again once it's cleaned, air-tested, and cleared for clinical staff to come back.
- Why choose us
Why Choose Us Your Healthcare Construction Contractor
Plenty of contractors can build an office. Working one wall away from an operating room is a different job altogether, and that’s usually why healthcare clients call Epic Construction Management. You’ll deal with a project leader who’s actually on site, and you’ll get plain-language updates on budget and schedule throughout.
Decades of Industrial Field Experience
Our deep construction industry experience and field knowledge guide every industrial project, giving proven results across many facility types while keeping schedules, budgets, and operational needs in focus.
Infection Control and ICRA Expertise
ICRA containment on our projects meets ASHE and Joint Commission expectations. We have the barriers and pressure monitors up before the first ceiling tile comes out, not after someone complains.
Work in Occupied, Operating Facilities
As a healthcare construction contractor, we're used to building with the doors open. We schedule loud work for the night shift and keep patient corridors clean, so care continues around us.
Code, Licensure, and Quality Assurance
We follow IDPH plan review, the FGI Guidelines, and NFPA 99 and 101 on every job. Inspections and records are kept current as we go, so licensure goes smoothly and you receive a fully documented project.
- Our Safety Process
Safety and Infection Control on Healthcare Job Sites
We see infection control as part of the safety program, no different from fall protection or a hot work permit. The Infection Control Risk Assessment (ICRA) sets the rules on our healthcare jobs, because someone down the hall may be immunocompromised, and construction dust, mold spores, or Legionella could put them at serious risk.
01
ICRA, Barriers, and Air Containment
Your ICRA class decides the barrier we build and the negative pressure we hold. Before anyone touches a ceiling tile, a supervisor checks both.
Interim Life Safety Measures
NFPA 101 requires fire protection to keep working while we build. When a system has to go offline, we post a fire watch until it comes back on.
03
Site Inspections and Daily Monitoring
Every day, a supervisor walks the job, reads the pressure gauges, and checks the seals. If something's off, it's logged and fixed before patients notice.

+
Years experience

+
Skilled workforce

+
Projects completed

%
Client satisfaction
- Location
General Contracting Services We Provide
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
- Schaumburg
- Arlington Heights
- Elgin
- Palatine
- Des Plaines
- Bartlett
- Roselle
- Bloomingdale
- South Elgin
- Bensenville
- Barrington
- Rosemont

Project Owner
Their team managed our project professionally from start to finish, ensuring quality work, timely completion, and clear communication throughout every phase.

Developer
We were impressed with their attention to detail and ability to keep everything on schedule while maintaining high standards across the entire project.

Business Owner
Excellent coordination and management skills helped us complete our construction project efficiently without delays or unexpected issues during execution stages.

Investor
Their experience and professionalism made a huge difference in delivering a successful project, and we would confidently work with them again in future.

Manufacturing Facility Owner
“Our factory expansion project was a success thanks to their expertise. They handled everything from planning to execution seamlessly. I’m impressed with their efficiency and attention to detail.”

- Client feedback
What Our Clients Say
Our clients describe our work better than we can. Here is what hospitals, practices, and facility owners have said about building with Epic Construction Management once the project was finished.

TESTIMONIALS
- Featured Projects
Construction Projects We've Delivered
Every healthcare job we take on gets the same discipline, from careful phasing to a clean handover. Below are builds where that showed: patients stayed safe and departments kept working while new medical space went up around them.
Mixed-Use Office Complex
Flexible Commercial Space
Corporate Office Headquarters
Modern Business Workspace
Restaurant & Hospitality Build
Premium Dining Experience
Retail Shopping Center
Retail Shopping Destination
Commercial Warehouse
Efficient Storage Facility
Industrial Processing Plant
Advanced Processing Facility
Distribution Center
Fast Logistics Hub
Food Processing Facility
Safe Food Production
Manufacturing Facility
Production Facility Built
Industrial Equipment Warehouse
Industrial Equipment Storage
The St. Andrews Church
Rapid response infrastructure
City center
Secure facility built precision
Municipal office complex
Efficient civic administration
Public school complex
Modern learning environment
Community health center
Advanced healthcare facility
- FAQ
Healthcare Construction FAQs
Before a healthcare construction project starts, hospitals, private practices, and facility owners tend to ask us many of the same questions. Here are our answers.
Any work on a space where patients are treated counts, so a new hospital wing and a two-room clinic refit both qualify. There are more rules than on a regular commercial job, and infection control applies from day one.
Hospitals, medical office buildings, surgery centers, clinics, and senior living spaces. Each one is a little different. An operating suite needs far more air changes per hour than a dental office, say, and we work out details like that during preconstruction.
Yes. We handle hospital construction and medical center construction, from new buildings and additions to renovations in acute care and diagnostic units. When a wing has to stay open, we break the job into phases and seal off the active area with ICRA containment.
Yes. We take on medical office construction and medical building construction of every size, from new builds and shell fit-outs to medical office build-outs for physician groups. We sort out exam room layouts and imaging equipment early; that's what keeps a practice on track to open when planned.
First, we complete an Infection Control Risk Assessment (ICRA) with your infection prevention staff. The class assigned to the space decides what goes up: sealed barriers, negative air machines, a protected path for workers, and a daily inspection log. We have all of it in place and verified before any demolition or ceiling work starts.
Yes, and in healthcare that is the usual situation. We push the loudest work to nights and weekends and route our deliveries through a separate entrance. Containment stays up the whole time, so the department next door can keep seeing patients.
Pricing swings widely with the project. Fitting out a medical office and renovating an operating room sit on very different scales, and finishes and building systems shift the number again. Working in an occupied building also adds cost for phasing and infection control. You see a full estimate during preconstruction, before you sign anything.
Building a hospital typically takes 2 to 5 years, depending on its size, design, location, and construction complexity.
In Illinois, plans for a licensed healthcare facility are reviewed by the Illinois Department of Public Health. The design and construction also need to meet the FGI Guidelines, NFPA 99 and 101, and Joint Commission expectations. We build and document to those standards so the facility is ready for state licensure at handover.
The easiest first step is to send us your drawings or your RFQ. Once we understand the scope, the timeline, and how your facility runs day to day, we put together a preconstruction plan with phasing and infection control worked in. Call 847-969-5100 or use the contact form below.
- GET IN TOUCH
Get Started With Your Healthcare Construction Project
Planning a hospital renovation, a medical office build-out, or a new clinic? Epic Construction Management is a healthcare construction firm based in Schaumburg. Our healthcare general contractors will sit down with you and plan the work around patient safety, code compliance, and a schedule your staff can actually live with.
- Departments stay open
- Transparent budgeting
- Dedicated project team
9:00 AM to 5:00 PM